表2 调试过程中进出水水质 (mg/L)
Table 2 Influent and effluent quality during commissioning operation
日期进水出水
CODBOD5NH3-NTNTPSSCODBOD5NH3-NTNTPSS
3月27日3157534.5483.6178346.90.428.50.43<5
3月28日3297836464.3184377.40.388.70.37<5
3月29日38810639523.4217397.20.518.90.43<5
3月30日3799442513.7203386.40.499.40.45<5
3月31日3869937544.4224447.30.559.70.39<5