马钢2500m3高炉煤气洗涤污水及污泥处理的改进
收稿日期: 2000-02-26
网络出版日期: 2010-10-01
Improvement of sewage and sludge treatment by gas washing at the 2500m3 blast furnace in Maanshan Iron and Steel Works
Received date: 2000-02-26
Online published: 2010-10-01
张长生 . 马钢2500m3高炉煤气洗涤污水及污泥处理的改进[J]. 工业水处理, 2001 , 21(4) : 38 -39 . DOI: 10.11894/1005-829x.2001.21(4).38
The operat ing technology of t reating sew age and sludge by g as washing at the 2500m3 blast furnace in Maanshan I ron and Steel Works and the improvement af ter putting it into production are int roduced in this paper, including the technological routines before and after the improvement, once -through precipitation, concentration at tw ice, cooling, sludge t reatment and water stability, etc.The emphasis is putting on the product ion running effect and economic benef it af ter the improvement.
/
〈 | 〉 |