双室床最优工况调试方法及运行注意事项
收稿日期: 2001-01-20
网络出版日期: 2010-10-01
Commissioning method of optimal condition of double chamber bed and its key operational process
Received date: 2001-01-20
Online published: 2010-10-01
田文华 . 双室床最优工况调试方法及运行注意事项[J]. 工业水处理, 2001 , 21(7) : 38 -41 . DOI: 10.11894/1005-829x.2001.21(7).38
In the commissioning of fixed double chamber bed,the height of resin and EPS inert plastic balls should be adjusted precisely,and the optimal consumption of regenerant can be determined by measuring the concentratio n of acid ( alkali ) in waste liquid. In operational period, water resource should be selected according to the design,and anion bed should be preheated and then regenerated with hot alkali liquid of 40 ℃ .In addition,the resin should be scrubbed periodically,to prevent the resin from pollution and to regenerate the polluted resin earlier.
[1] 双室床研制小组.宝鸡发电厂阳、阴双室床设计调整试验总结[J].西北电力技术,1980,(3):10~15.
[2] Rui Qiaoshen.The research of chemical fixed double chamber bed demineralizing equipment[C].The Fifth Symposium on SINO-JAPANESE Thermal Power Plant Water Treatment, Tokyo, Japan, 1996.
[3] 田文华,郭安祥,马海燕.离子交换树脂污染原因分析及复苏效果[J].西北电力技术,2000,(5):4~7.
[4] 田文华,马悦红.双室固定床水处理设备的特点及案例研究[J].工业水处理,2001,(2):32~34.
/
〈 | 〉 |