改良型两段活性污泥工艺在污水厂升级改造中的应用
曹隽,庞一敏

Application of modified two-stage activated sludge process in upgrading and reconstruction of wastewater treatment plant
Jun Cao,Yimin Pang
表1 改造前实际进出水水质
mg/L
项目 COD BOD5 NH3-N TN TP SS
进水 259~363 145~273 23~30 28~76 2.99~5.6 152~196
出水 22.6~33.2 9.9~15.7 18.1~21.2 26.1~30.2 1.32~1.70 8.0~19.7