AB法工艺脱氮除磷提标改造工程实例
柴春省,张伟

An engineering case: upgrading of nitrogen and phosphorus removal by AB process
Chunsheng Chai,Wei Zhang
表1 设计进出水及实际进出水水质(2016.01—2017.08)
Table 1 Design and actual water quality in 2016.01—2017.08
项目/(mg·L-1 COD BOD5 SS NH3-N TN TP
设计进水水质 680 260 280 25 35 6
设计出水水质 60 20 20 8(15) 20 1
实际进水水质 84~360 31~137 96~176 11~56 18~61 1.2~4.3
二沉池出水水质 25~46 3.4~6.2 8~15 0.6~2.2 11.5~22.6 0.9~2.58
实际出水水质 16~37 2.2~3.6 3~8 0.5~2.0 11.3~22.3 0.37~1.50