AB法工艺脱氮除磷提标改造工程实例
柴春省,张伟
An engineering case: upgrading of nitrogen and phosphorus removal by AB process
Chunsheng Chai,Wei Zhang
表1
设计进出水及实际进出水水质(2016.01—2017.08)
Table 1
Design and actual water quality in 2016.01—2017.08
项目/(mg·L
-1
)
COD
BOD
5
SS
NH
3
-N
TN
TP
设计进水水质
680
260
280
25
35
6
设计出水水质
60
20
20
8(15)
20
1
实际进水水质
84~360
31~137
96~176
11~56
18~61
1.2~4.3
二沉池出水水质
25~46
3.4~6.2
8~15
0.6~2.2
11.5~22.6
0.9~2.58
实际出水水质
16~37
2.2~3.6
3~8
0.5~2.0
11.3~22.3
0.37~1.50