乡镇生活和工业融合污水处理站改造设计及运行
魏爱书,巴德鹏,周勇,牛晓君,王瑞霖

Design and operation of township domestic and industrial integrated sewage treatment station reconstruction
Aishu WEI,Depeng BA,Yong ZHOU,Xiaojun NIU,Ruilin WANG
表5 改造后关键工艺段污染物平均去除率
Table 5 Average removal rate of pollutants in key process sections after reconstruction
工艺段CODNH3-NTNTP
去除率/%累积去除率/%去除率/%累积去除率/%去除率/%累积去除率/%去除率/%累积去除率/%
倒置A2/O67.3567.3553.1353.1350.1150.1147.6447.64
MBBR池54.3085.0878.6489.9944.0672.0926.3661.44
二沉池4.4985.753.6090.352.4772.782.3662.35
高效沉淀池2.9586.171.6690.511.1073.0882.6393.46