UASB—MBR—NF/RO工艺处理焚烧发电厂垃圾渗滤液
章万喜,潘乔晖,黎忠,詹广峰,梁慧敏,何丽君,孔成功

Treatment of landfill leachate from incineration power plant by UASB—MBR—NF/RO process
Wanxi ZHANG,Qiaohui PAN,Zhong LI,Guangfeng ZHAN,Huimin LIANG,Lijun HE,Chenggong KONG
表3 电导率在MBR中的变化情况
Table 3 Changes of conductivity in MBR
时间/d1234567891011121314151617

进水电导率/

(mS·cm-1

38.039.7540.24039.6537.538.533.4537.5537.753835.83635.536.4538.137.25

出水电导率/

(mS·cm-1

19.9219.8619.5819.9419.9821.3221.6221.7627.4525.3524.822.2524.4525.32725.926.15
时间/d18192021222324252627282930313233

进水电导率/

(mS·cm-1

40.23839.437.93837.535.134.0536.5383940.639.038.037.736

出水电导率/

(mS·cm-1

26.3526.626.122.525.823.527.323.226.624.725.724.824.2523.822.5522.1