UASB—MBR—NF/RO工艺处理焚烧发电厂垃圾渗滤液
|
章万喜,潘乔晖,黎忠,詹广峰,梁慧敏,何丽君,孔成功
|
Treatment of landfill leachate from incineration power plant by UASB—MBR—NF/RO process
|
Wanxi ZHANG,Qiaohui PAN,Zhong LI,Guangfeng ZHAN,Huimin LIANG,Lijun HE,Chenggong KONG
|
|
表3 电导率在MBR中的变化情况
|
Table 3 Changes of conductivity in MBR
|
|
时间/d | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 |
---|
进水电导率/ (mS·cm-1) | 38.0 | 39.75 | 40.2 | 40 | 39.65 | 37.5 | 38.5 | 33.45 | 37.55 | 37.75 | 38 | 35.8 | 36 | 35.5 | 36.45 | 38.1 | 37.25 | 出水电导率/ (mS·cm-1) | 19.92 | 19.86 | 19.58 | 19.94 | 19.98 | 21.32 | 21.62 | 21.76 | 27.45 | 25.35 | 24.8 | 22.25 | 24.45 | 25.3 | 27 | 25.9 | 26.15 | 时间/d | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | | 进水电导率/ (mS·cm-1) | 40.2 | 38 | 39.4 | 37.9 | 38 | 37.5 | 35.1 | 34.05 | 36.5 | 38 | 39 | 40.6 | 39.0 | 38.0 | 37.7 | 36 | | 出水电导率/ (mS·cm-1) | 26.35 | 26.6 | 26.1 | 22.5 | 25.8 | 23.5 | 27.3 | 23.2 | 26.6 | 24.7 | 25.7 | 24.8 | 24.25 | 23.8 | 22.55 | 22.1 | |
|
|
|