青神县工业开发区污水处理厂设计与调试运行
戴红, 王飞, 秦川, 刘杰

Design and commissioning operation of WWTP in industrial development zone of Qingshen
Hong DAI, Fei WANG, Chuan QIN, Jie LIU
表2 调试过程中进出水水质
Table 2 Influent and effluent quality during commissioning
时间进水生化池出水Fenton系统出水
CODNH3-NTNTPCODNH3-NTNTPCODNH3-NTNTP
11月2日59318.633.63.6830.510.81.17350.1110.70.12
11月3日64520.434.54.3920.712.81.29370.1612.70.15
11月4日56715.228.53.8750.510.21.06320.1210.40.11
11月5日62221.334.63.9800.611.51.23370.1411.40.16
11月6日60515.729.44.2790.713.01.34340.1813.20.15
11月7日63817.132.33.8870.813.21.38360.1713.10.17
11月8日66123.234.74.5951.014.51.45390.1914.40.18