预臭氧+MBR+后臭氧工艺在焦化园区污水厂改造中的应用
李志雷, 刘宝富, 陈秀娟, 张德祥

Application of combined process pre ozone plus MBR and post ozone in sewage plant technical transformation project of coking park
Zhilei LI, Baofu LIU, Xiujuan CHEN, Dexiang ZHANG
表2 改造前各工艺段平均出水水质 (mg/L)
Table 2 Average effluent quality of each process section before technical transformation
水质CODBOD5氨氮总氮总磷
调节池出水2803248542.12
气浮出水2663046521.26
厌氧池出水2403544501.13
好氧池出水844.13.5190.45
炭粉池出水383.23.2180.41