工业水处理 ›› 1997, Vol. 17 ›› Issue (3): 40-42,46. doi: 10.11894/1005-829x.1997.17(3).40
• 经验交流 • 上一篇 下一篇
周红梅
收稿日期:
出版日期:
发布日期:
作者简介:
Zhou Hongmei
Received:
Online:
Published:
摘要:
喷水织机要求其使用的水电导率在130~300μs/cm之间。结合一工程实例,通过分析和计算,对水处理方案进行了可行性研究。
Abstract:
The water-jet loom requires the water conductivity used should be at the range in 130~300μs /cm. Combining with an engineering example, the practicability investigation of water treatment has been done through a nalysis and calculation.
周红梅. 结合工程实例浅淡“如何满足喷水织机对水的电导率要求”[J]. 工业水处理, 1997, 17(3): 40-42,46.
Zhou Hongmei. HOW TO MEET THE WATER CONDUCTIVITY REQUIREMENT TO WATER - JET LOOM - COMBINING WITH AN ENGINEERING EXAMPLE[J]. INDUSTRIAL WATER TREATMENT, 1997, 17(3): 40-42,46.
/ / 推荐 / 导出引用
链接本文: https://www.iwt.cn/CN/10.11894/1005-829x.1997.17(3).40
https://www.iwt.cn/CN/Y1997/V17/I3/40
[1] 汪金福,孙雨芳. 国外喷水织机. 纺织工业出版社, 1988 [2] 梁文耀,贾克欣等. 给水排水设计手册(第四册) . 中国建筑工业出版社, 1986