Discussion of the operational problems of floating double-room anion exchanger
Received date: 2005-06-06
Online published: 2010-10-01
The running period is always unstable,since the double-room anion exchanger of the water treatment plant have restricted the economic running seriously. Aiming at the existing problems,the operation adjustment and technical improvement are carried out through analysis. At last the periods of the anion bed water making are prolonged. While lessening the material consumption,the cost of production is reduced,ensuring that the equipment runs steadily and chronically.
Key words: anion bed; resin; water treatment
Hang Qing . Discussion of the operational problems of floating double-room anion exchanger[J]. Industrial Water Treatment, 2005 , 25(10) : 68 -70 . DOI: 10.11894/1005-829x.2005.25(10).68