Attentions to be paid in design and erection of large reverse osmosis facilities
Received date: 2001-04-21
Online published: 2010-10-01
Defects and shortages exist ing in process design of large industrial reverse osmosis facilit ies in China at presentare pointed out.Constructive and valuable recommendations in process design and application ofreverse osmosis facilities in the future are presented based on practice and eng ineering experiences in recent years.
Key words: large reverse osmosis; pretreat ment; high pressure pump; scale inhibitor
DING Li-qun . Attentions to be paid in design and erection of large reverse osmosis facilities[J]. Industrial Water Treatment, 2002 , 22(1) : 58 -59 . DOI: 1011894/1005-829x.2002.22(1).58
/
〈 | 〉 |