摘要:
活性污泥数学模型No.1(ASM1)涉及的参数多,而且数学模型是非线性的,求解困难。采用非线性优化的方法仿真ASM1,把仿真结果和基准值做了比较。仿真结果证明非线性优化仿真方法可行。
关键词:
稳态仿真,
非线性优化,
活性污泥数学模型
Abstract:
Active sludge mathematic model No.1(ASM1) relates to many parameters, and it isnonlinear, soit ishard to besolved. The nonlinear optimized method isused for simulating ASM1. The simulation result and datumvalue are compared. The result shows that nonlinear optimized simulation is feasible.
Key words:
stablestate simulation,
nonlinear optimization,
active sludge mathematic model
中图分类号:
张英爽, 宋嗣新, 杜齐喜, 田恩杰. 基于优化算法对活性污泥数学模型稳态仿真[J]. 工业水处理, 2007, 27(2): 68-70.
Zhang Yingshuang, Song Sixin, Du Qixi, Tian Enjie. Study on stable statesimulation of the active sludge mathematic model[J]. INDUSTRIAL WATER TREATMENT, 2007, 27(2): 68-70.