Abstract:
A simplified new technique for the treatment of industrial wastewater is designed, in which 2~4 ponds are saved as saved com-pared to conventional technique. Conventional design for settleponds have been a changed multifunctional and high-efficientseparating pond is used.When the SS is 10~2 500 mg/L andthe oil is 1~25 mg/L at the inlet of industrial waste water ofpower plants it can make the SS and the oil at the outlet of thetreated waste water below 20 mg/ L and 2 mg/ L seperatively(generally SS is 10 mg/ L and the oil is below 1mg/ L) and thetreated water can also he use as cooling circulation water.
摘要:
采用了简单的废水处理工艺,比常规工艺省去了2~4个处理设施,设计了一池多用的高效分离池,选择了合适的试剂.有效地去除了工业废水中污染物,处理后的水作为循环冷却水使用.
关键词:
工业废水,
分离池,
回收利用
Li Qianlong. RECOVERY TECHNIQUE OF INDUSTRIAL WASTEWATER IN POWER PLANT[J]. INDUSTRIAL WATER TREATMENT, 1998, 18(2): 14-16,45.