INDUSTRIAL WATER TREATMENT ›› 2005, Vol. 25 ›› Issue (1): 64-65,74. doi: 10.11894/1005-829x.2005.25(1).64

Previous Articles     Next Articles

Discussion on the pilot plant scale technical process of industrial effluent reuse

Li Hua, Meng Zhaoqing, Li Zhenjiang   

  1. Utility Plant, Liaoyang Petrochemical Co., Liaoyang 111003, China
  • Received:2004-04-07 Online:2005-01-20 Published:2010-10-01

工业污水回用中试工艺流程的探讨

李华, 孟昭庆, 李振江   

  1. 辽阳石化分公司动力厂, 辽宁 辽阳 111003
  • 作者简介:李华(1960- ),1982年毕业于沈阳化工学院,高级工程师,电话:0419-5154801,E-mail:dlclh@cnpc-lh.com.

Abstract:

The study on pilot plant scale experiment of reusing effluent from R350 secondary sedimentation tank has been made. The scale of the pilot plant scale experiment is 4 t/h. The technical process is designed according to a variety of factors, such as the quality feature of the effluent, the purpose of reutilization and the treating cost. The process is improved to be more suitable in the course of the experiment. The expected result has been obtained.

Key words: industrial sewage, filter, reclaimed water reuse

摘要:

针对94#装置R350二沉池排水进行污水回用中试研究,中试装置规模为4t/h。根据水质特点、回用目的以及制水成本等多方面因素考虑,设计了一种工艺流程,并在中试过程中对该工艺流程不断改进,使其更加合理,取得了预期的水处理效果。

关键词: 工业污水, 过滤池, 中水回用

CLC Number: