INDUSTRIAL WATER TREATMENT ›› 2011, Vol. 31 ›› Issue (10): 42-45. doi: 10.11894/1005-829x.2011.31(10).42

Previous Articles     Next Articles

Treatment of landfill leachates by waste iron-scraps coupling with aged-refuse-based reactor

An Xiaoying1, He Yan2, Tao Ruifeng3, Li Zhen2, Guo Cuixiang4, Wang Ligang5   

  1. 1. CNOOC Tianjin Chemical Research & Design Institute,Tianjin 300131,China;
    2. School of Resource and Environment,East China Normal University,Shanghai 200062, China;
    3. CNPC First Discipline Inspection and Supervision Center,Beijing 100028,China;
    4. School of Life and Environmental Science,Shanghai Normal University,Shanghai 200234,China;
    5. PetroChina Jilin Oilfield Company Honggang Oil Production Plant,Songyuan 138000,China
  • Received:2011-07-15 Online:2011-10-20 Published:2011-10-25

废铁屑耦合矿化垃圾反应床处理填埋场渗滤液研究

安晓英1, 何岩2, 陶锐锋3, 李真2, 郭翠香4, 王力刚5   

  1. 1. 中海油天津化工研究设计院,天津300131;
    2. 华东师范大学资源与环境学院,上海200062;

    3. 中国石油天然气集团公司第一纪检监察中心,北京100028;

    4. 上海师范大学生命与环境科学学院,上海200234;

    5. 中石油吉林油田公司红岗采油厂,吉林松原138000
  • 作者简介:安晓英(1979- ),2006 年毕业于河北工业大学,硕士,工程师。电话:022-26689123,E-mail:anxiaoying2007@yahoo.com.cn。

Abstract:

In order to build the optimal process of waste iron scraps coupling with aged-refuse-based reactor, the influences of retention time on the iron-scraps-based treatment of landfill leachate and the effluent from the agedrefuse- based reactor have been contrasted and analyzed,respectively. Subsequently,the treatment effect of the preceding waste-iron-scraps coupling with the aged-refuse-based reactor on the landfill leachate is investigated. The results show that without pH adjustment,the preceding iron-scraps-fixed reactor and the intermittent aeration-sedimentation have apparent capacity for strengthening the removal performance of the aged-refuse-based reactor in terms of COD and ammonium-nitrogen. The COD and ammonium-nitrogen concentrations in the effluent are less than 150 mg/L and 5 mg/L. With the continuous improvement in the iron-scrap-fixed reactor,the preceding iron-scrapsfixed reactor and the intermittent aeration-sedimentation could be considered as a promising way in strengthening the removal performance of the aged-refuse-based reactor,which is of great significance for the economic and effective treatment of landfill leachates.

Key words: waste iron scraps, aged-refuse-based reactor, intermittent aeration, landfill leachates

摘要:

为了构建合理的废铁屑耦合矿化垃圾反应床工艺,分别进行了停留时间对铁屑处理填埋场渗滤液和矿化垃圾反应床出水的影响对比分析,并据此研究了前置铁屑固定床耦合矿化垃圾反应床处理填埋场渗滤液的效能。结果表明,在不进行pH 调节的条件下,前置铁屑固定床和间歇曝气沉淀具有明显强化反应床体系去除COD 和氨氮的能力,出水COD 和氨氮分别小于150 mg/L 和5 mg/L。随着铁屑内电解反应器的不断完善,前置铁屑固定床和间歇曝气沉淀可作为强化矿化垃圾反应床处理填埋场渗滤液的有效途径,为经济有效地处理填埋场渗滤液提供了一条新思路。

关键词: 废铁屑, 矿化垃圾反应床, 间歇曝气, 填埋场渗滤液

CLC Number: