Abstract:
Taking a wastewater treatment plant,in Ruian City as example,technological introduction and operation data analysis have been made. One of the problems encountered in the multi-mode A2/O oxidation ditch process in actual running is that the removing result of total phosphorus isn’t good. Better ways having been tried for improvement,satisfactory results are finally obtained.
Key words:
multi-mode A2/O oxidation ditch process,
total phosphorus,
multi-dosing,
efficient sedimentation
摘要:
以瑞安市某污水厂为例,进行工艺介绍及运行数据分析,总结出多模式A2/O氧化沟工艺在实际运行过程中遇到的问题之一是除总磷效果不理想,并尝试通过改进工艺找出改善途径,最终取得了满意的效果。
关键词:
多模式A2/O氧化沟工艺,
总磷,
多点加药,
高效沉淀
CLC Number:
Zhang Hongrong, Zhou Xin. Deficiencies of multi-mode A2/O oxidation ditch process in operation and their improvement[J]. INDUSTRIAL WATER TREATMENT, 2012, 32(5): 92-93.
张洪荣, 周鑫. 多模式A2/O氧化沟工艺运行中的不足及改进方法[J]. 工业水处理, 2012, 32(5): 92-93.