INDUSTRIAL WATER TREATMENT ›› 2012, Vol. 32 ›› Issue (5): 92-93. doi: 10.11894/1005-829x.2013.33(6).92

Previous Articles     Next Articles

Deficiencies of multi-mode A2/O oxidation ditch process in operation and their improvement

Zhang Hongrong1, Zhou Xin2   

  1. 1. Hangzhou Environmental Protection Co., Ltd., Hangzhou 310007, China;
    2. Zhejiang Construction Equipment Tendering Co., Ltd., Hangzhou 310007, China
  • Received:2012-03-20 Published:2012-05-18

多模式A2/O氧化沟工艺运行中的不足及改进方法

张洪荣1, 周鑫2   

  1. 1. 杭州市环境保护有限公司, 浙江杭州 310007;
    2. 浙江省建设工程设备招标有限公司, 浙江杭州 310007
  • 作者简介:张洪荣(1979-),2004年毕业于山东大学,工程师,硕士。E-mail:zhrsmile@163.com

Abstract:

Taking a wastewater treatment plant,in Ruian City as example,technological introduction and operation data analysis have been made. One of the problems encountered in the multi-mode A2/O oxidation ditch process in actual running is that the removing result of total phosphorus isn’t good. Better ways having been tried for improvement,satisfactory results are finally obtained.

Key words: multi-mode A2/O oxidation ditch process, total phosphorus, multi-dosing, efficient sedimentation

摘要:

以瑞安市某污水厂为例,进行工艺介绍及运行数据分析,总结出多模式A2/O氧化沟工艺在实际运行过程中遇到的问题之一是除总磷效果不理想,并尝试通过改进工艺找出改善途径,最终取得了满意的效果。

关键词: 多模式A2/O氧化沟工艺, 总磷, 多点加药, 高效沉淀