工业水处理 ›› 2021, Vol. 41 ›› Issue (10): 133-136. doi: 10.19965/j.cnki.iwt.2020-1182

• 工程实例 • 上一篇    下一篇

酚氰废水处理工程实践

金玉涛1,史大勇1,郭利华1,尹晓峰2,*()   

  1. 1. 河北钢铁集团邯钢邯宝公司焦化厂, 河北邯郸 056015
    2. 天津派瑞环境工程技术有限公司, 天津 300400
  • 收稿日期:2021-08-13 出版日期:2021-10-20 发布日期:2021-10-26
  • 通讯作者: 尹晓峰 E-mail:83639232@qq.com
  • 作者简介:金玉涛(1983-), 工学硕士, 高级工程师
  • 基金资助:
    河北省社会科学基金项目(HB18GL027)

Engineering practice of phenol cyanide wastewater treatment

Yutao JIN1,Dayong SHI1,Lihua GUO1,Xiaofeng YIN2,*()   

  1. 1. Hebei Iron&Steel Group Handan Hanbao Iron and Steel Company Coking Plant, Handan 056015, China
    2. TJPR Environmental Engineering Technology Co., Ltd., Tianjin 300400, China
  • Received:2021-08-13 Online:2021-10-20 Published:2021-10-26
  • Contact: Xiaofeng YIN E-mail:83639232@qq.com

摘要:

介绍了某钢铁企业焦化厂酚氰废水处理站的工艺设计、特点与运行效果。废水站设计进水量为150 m3/h,采用重力除油+加压溶气气浮+SDN(A/OO+二沉池)+混凝沉淀的核心处理工艺,出水水质稳定达到《炼焦化学工业污染物排放标准》(GB 16171—2012)中的新建企业间接排放标准的要求,其可回用于高炉冲渣等低水质要求工序,节水效果显著。废水站所产的剩余污泥、含油泥渣废物回用于配煤炼焦,站区无废物外排。

关键词: 酚氰废水, 气浮, 同步硝化反硝化, 工程实践

Abstract:

This paper introduced the process design, characteristics and operation effects of phenol cyanide wastewater treatment in a coking plant of a steel enterprise. Design water inflow of the wastewater treatment station was 150 m3/h. The core treatment process was gravity degreasing+pressurized dissolved air flotation+ SDN(A/OO+secondary sedimentation tank)+coagulation sedimentation. The effluent quality was stable and met the requirements of the indirect emission standard for newly-built enterprises in the 'Emission Standards for Pollutants from the Coking Chemical Industry'(GB 16171-2012). The effluent could be reused in processes with low water quality requirements, such as blast furnace slag flushing to achieve obvious saving water effect. The sludge and oil sludge of wastewater station were mixed with coal for reuse, no waste efflux.

Key words: phenol cyanide wastewater, air flotation, simultaneous nitrification and denitrification(SND), engineering practice