工业水处理 ›› 2012, Vol. 32 ›› Issue (5): 94-96. doi: 10.11894/1005-829x.2013.33(6).94

• 经验交流 • 上一篇    

反渗透调试运行中出现问题分析及对策

秦昊   

  1. 陕西渭河煤化工集团有限责任公司供排水车间, 陕西渭南 714000
  • 收稿日期:2012-03-15 发布日期:2012-05-18
  • 作者简介:秦昊(1984-),2007年毕业于天津科技大学,助理工程师。电话:15291303121

Analysis and countermeasures of the problems occurred in reverse osmosis during debugging and running

Qin Hao   

  1. Water Supply and Drainage Workshop, Shaanxi Weihe Coal Chemical Group Ltd., Weinan 714000, China
  • Received:2012-03-15 Published:2012-05-18

摘要:

介绍了陕西渭河煤化工集团的地下水预脱盐系统工艺流程,以及调试运行过程中出现的工艺及设备问题。分析了反渗透系统进水电导率、进水SDI、进水余氯及ORP、保安过滤器、产水背压等对系统的影响,并提出对策。

关键词: 反渗透, 调试运行, 脱盐

Abstract:

The technological process of the groundwater pre-desalination system of Shaanxi Weihe Coal Chemical Engineering Group,as well as the technical and equipment problems occurred in the process of debugging and running,is introduced. Meanwhile,in the reverse osmosis system,the effects of electrical conductivity,influent SDI,influent residual chlorine and ORP,security filter,produced water backpressure,etc. on the system are analyzed and discussed,and corresponding countermeasures are put forward.

Key words: reverse osmosis, debugging and running, desalination

中图分类号: