INDUSTRIAL WATER TREATMENT ›› 2014, Vol. 34 ›› Issue (3): 87-90. doi: 10.11894/1005-829x.2014.34(3).087

Previous Articles     Next Articles

Optimization of CASS processing operating parameters in a sewage treatment plant in Xianyang

Guo Jinxin, Sun Genxing, Di Qian   

  1. College of Natural Resource and Environment, Shaanxi University of Science & Technology, Xi'an 710021, China
  • Received:2013-12-01 Online:2014-03-20 Published:2014-03-21

咸阳某污水处理厂CASS工艺运行参数优化

郭金鑫, 孙根行, 狄倩   

  1. 陕西科技大学资源与环境学院, 陕西西安 710021
  • 作者简介:郭金鑫(1988-),在读硕士。电话:18392184969,E-mail:342200217@qq.com。
  • 基金资助:

    博士科研启动基金项目(2010BJ10-06)

Abstract:

Aiming at the fact that in the course of treating urban sewage by CASS process,the removing effects of COD,BOD5,SS,NH3-N are high,but removing effects of TN and TP are not good,the operating parameters of CASS process have been optimized and adjusted. After the adjustment,the removing rates of COD,BOD5,SS,TN,NH3-N and TP are 94.2%,88.6%,93.7%,69.9%,96.8%,and 78.4%,respectively. Every effluent index can meet the requirements of level B in class Ⅰ of Discharge Standard of Pollutants from Urban Sewage Treatment Plants(GB 18918-2002).

Key words: cyclic activated sludge system, sewage treatment, urban sewage

摘要:

针对污水处理厂CASS工艺处理城市污水过程中COD、BOD5、SS、NH3-N去除率较高,但TN、TP去除效果不佳的情况,优化调整了CASS工艺运行参数。调整后COD、BOD5、SS、TN、NH3-N、TP的去除率分别为94.2%、88.6%、93.7%、69.9%、96.8%、78.4%,各项出水指标均达到《城镇污水处理厂污染物排放标准》(GB 18918-2002)一级B标准。

关键词: CASS, 污水处理, 城市污水

CLC Number: