INDUSTRIAL WATER TREATMENT ›› 2014, Vol. 34 ›› Issue (4): 14-17. doi: 10.11894/1005-829x.2014.34(4).014

Previous Articles     Next Articles

Experimental study on the start-up of two-phase anaerobic process for treating synthetic pharmaceutical wastewater

Fang Junhua1,2, Cai Pengcheng1, Huang Wei1   

  1. 1. School of Urban Construction and Environmental Engineering, Chongqing University, Chongqing 400045, China;
    2. Key Laboratory of Eco-Environment Department of Education, the Three Gorges Reservoir Region, Chongqing University, Chongqing 400045, China
  • Received:2014-03-07 Online:2014-04-20 Published:2014-04-25

两相厌氧工艺处理合成制药废水的启动试验研究

方俊华1,2, 蔡鹏程1, 黄维1   

  1. 1. 重庆大学城市建设与环境工程学院, 重庆 400045;
    2. 重庆大学三峡库区生态环境教育部重点实验室, 重庆 400045
  • 作者简介:方俊华(1965-),副教授。E-mail:fangjunhua1126@126.com。
  • 基金资助:

    水体污染控制与治理科技重大专项(2008ZX7315-003)

Abstract:

Using aerobic sludge from a domestic sewage plant as seed sludge,the start-up experiment of two-phase anaerobic system designed for treating synthetic pharmaceutical wastewater has been studied. The water temperature is controlled at (35±1)℃,and influent pH’s of acidogenic reactor and methanogenic reactor are maintained at 5.5-6.5,and 7.0±0.3,respectively. The volume load rate (VLR) of the system is improved alternately by raising influent COD and increasing influent flow rate. After 51 days of start-up operation,the VLR,HRT and COD removing rates reach 4.7 kg/(m3·d),36 h and 89.5%,respectively. Both acidogenic reactor and methanogenic reactor have cultured a sufficient amount of anaerobic sludge for treating this kind of wastewater,indicating that the two-phase anaerobic reactor has been started up successfully.

Key words: two-phase anaerobic, pharmaceutical wastewater, start-up

摘要:

设计了两相厌氧系统,以生活污水厂好氧污泥为种泥,对合成制药废水进行启动试验研究。控制水温在(35±1)℃,产酸反应器进水pH在5.5~6.5、产甲烷相进水pH在7.0±0.3,通过交替提高进水COD与增大进水流量提高系统容积负荷(VLR)。经过51 d的启动运行,系统的VLR达到4.7 kg/(m3·d), HRT为36 h,COD去除率达到89.5%。产酸和产甲烷反应器均培养出足量的适于处理该废水的厌氧污泥,表明两相厌氧反应启动成功。

关键词: 两相厌氧, 制药废水, 启动