Technical modification of the coking wastewater in a coking plant in Henan

Zhang Meng1,2, Ding Shaofeng1,2, Teng Jilin1,2, Jin Xin1,2, Cui Cancan1,2   

  1. 1. Nanri Group Corporation State Grid Electric Power Research Institute, Nanjing 210000, China;
    2. Beijing Guodianfutong Science and Development Co., Ltd., Beijing 100070, China
  • Received:2017-09-08 Online:2017-11-20 Published:2017-12-21

摘要: 河南某焦化厂污水处理站采用预处理—生化—混凝沉淀常规处理工艺,出水水质差,影响后续回用单元处理效果。在原有废水处理设施基础上,工程改造在预处理单元增加污泥吸附,并在曝气池投加活性焦粉吸附剂,形成活性焦吸附与生化处理耦合工艺,提高生化处理效果。增加活性焦吸附深度处理单元,对混凝沉淀池出水进行进一步吸附处理,确保最终出水COD达到《炼焦化学工业污染物排放标准》(GB 16171—2012)。

关键词: 焦化废水, 改造, 活性焦, 吸附

Abstract: The conventional treatment process:pretreatment-biochemistry-coagulation precipitation used to be used by the wastewater treatment station of a coking plant in Henan,China. Its effluent water quality was poor,affecting the treatment effect of subsequent recycling unit. On the basis of the original wastewater treatment equipment,the project modification has been implemented by means of adding sludge adsorption to the pretreatment unit,and dosing activated coke powder adsorbent to the aeration tank,so as to form activated coke adsorption and biochemical treatment coupling technology and improve the biochemical treatment effect. Further adsorption treatment has been accomplished for the effluent from coagulation precipitation tank by the addition of activated coke adsorption advanced treatment unit,ensuring that the final effluent COD reaches the Pollutant Discharge Standard for Coking Chemical Industry(GB 16171—2012)

Key words: coking wastewater, modification, activated coke, adsorption