工业水处理 ›› 2014, Vol. 34 ›› Issue (8): 82-84. doi: 10.11894/1005-829x.2014.34(8).082

• 工程实例 • 上一篇    下一篇

初沉要混凝沉淀要吸附工艺处理高浓度含氟废水工程实例

董建威   

  1. 四川理工学院建筑工程学院, 四川自贡 643000
  • 收稿日期:2014-07-07 出版日期:2014-08-20 发布日期:2014-08-25
  • 作者简介:董建威(1975-),硕士,讲师。E-mail:1844255@qq.com。

Treatment of highly concentrated fluoride-containing wastewater by preliminary sedimentation-coagulation precipitation-adsorption process

Dong Jianwei   

  1. Institute of Architecture and Engineering, Sichuan University of Science and Engineering, Zigong 643000, China
  • Received:2014-07-07 Online:2014-08-20 Published:2014-08-25

摘要:

针对某石英制品企业排放的高浓度含氟废水,采用初沉-混凝沉淀-吸附组合工艺进行处理。工程实践结果表明:在加药量维持相对稳定的情况下,出水氟化物质量浓度可稳定控制在5 mg/L以下,达到了当地环境保护局要求的控制标准。

关键词: 含氟废水, 混凝沉淀, 吸附

Abstract:

The highly concentrated fluoride-containing wastewater discharged from a quartz-producing enterprise has been treated by preliminary sedimentation-coagulation precipitatiobn-adsorption process. The results of engineering practice show that when the dosing amount keeps stable,the mass concentration of effluent fluoride can be controlled steadily under 5 mg/L,reaching the discharge standards required by the local Environmental Protection Agency.

Key words: fluoride-containing wastewater, coagulation precipitation, adsorption

中图分类号: